Collaborative Manufacturing Across Two Specialist Facilities
This project demonstrates the strength of a coordinated manufacturing approach between Progress Engineering Limited (PEL) and James Camden Engineering (JCE), combining complementary capabilities to deliver a high-quality, precision-engineered component.
The component required a combination of machining, precision finishing, and controlled handling across multiple stages of production. To achieve this efficiently, the work was strategically split between both facilities, ensuring each stage was carried out in the most suitable environment.
Production Stages
Stage 1 – Pre-Machining of Hub (PEL)
Initial machining of the hub was carried out at PEL to establish critical datums and prepare the component for downstream processes. This ensured that sufficient material was left on the faces and bores for final machining, and post welding fabrication.
Stage 2 – Laser Cut Profile Preparation (PEL)
Precision laser-cut profiles were produced and prepared at PEL, forming the basis of the fabricated structure. This allowed tight control of geometry prior to assembly.
Stage 3 – Fabrication & Assembly (PEL)
All fabricated elements were assembled and welded at PEL under controlled conditions, ensuring structural integrity and alignment ahead of finishing operations.
Stage 4 – Weld Dressing & Polishing (PEL)
Welds were dressed and polished to achieve the required surface finish and remove excess material, preparing the component for final machining. Care was taken to ensure a hygienic, crack and crevice free finish.
Stage 5 – Post-Weld Machining of Hub (PEL)
Following fabrication, the hub was re-machined at PEL to correct any distortion introduced during welding. This step restored critical tolerances and ensured concentricity and alignment.
Stage 6 – Wire Erosion of Double Keyway (JCE)
The component was transferred to JCE for high-precision wire EDM of the double keyway. This process enabled extremely tight tolerances and accuracy that conventional machining could not reliably achieve.
Stage 7 – Dynamic Balancing
The completed part was then sent to a partner company for dynamic balancing to the customers specification.
Stage 8 – Final Finishing, QC Inspection & Dispatch (PEL / JCE)
Final inspection and finishing operations were completed, ensuring the component met all dimensional and quality requirements before being securely packaged and dispatched to the customer.
This project highlights the value of a fully integrated manufacturing approach, where the combined strengths of Progress Engineering Limited and James Camden Engineering are leveraged to deliver results that neither facility could achieve as efficiently in isolation.
By aligning capability, process control, and precision at each stage, we not only met the technical demands of the component, but delivered a consistent, high-quality outcome with complete confidence in performance and repeatability.
Customer bennifits with DEG Integration
Operating under the Drive Engineering Group (DEG) structure provides a level of coordination and control that extends beyond a traditional multi-supplier arrangement. Rather than managing separate subcontractors, the customer benefits from a unified manufacturing ecosystem where communication, scheduling, and quality standards are aligned from the outset.
Each facility within DEG operates with full visibility of the overall project requirements, enabling proactive planning between stages rather than reactive handovers. This reduces lead time risk, eliminates ambiguity in responsibility, and ensures that every process is executed with a clear understanding of downstream implications.
The integration between PEL and JCE allows for seamless transition between manufacturing stages, with shared quality expectations and consistent engineering standards. This avoids the typical friction points seen when components move between unrelated suppliers, where interpretation, tolerance stack-up, and accountability can often become diluted.
From a commercial perspective, this structure simplifies procurement. The customer engages with a single, accountable group while still accessing a broad range of specialist capabilities. This delivers the flexibility of a multi-supplier solution without the administrative burden or associated risk.
Customer Impact Without DEG Integration
Without the coordinated approach provided by DEG, the customer would have been required to source, manage, and align multiple independent suppliers across machining, fabrication, wire EDM, and finishing processes.
This introduces several layers of complexity. Each supplier would operate with their own interpretation of drawings, tolerances, and process priorities, increasing the risk of misalignment between stages. Responsibility for dimensional accuracy and quality would become fragmented, making issue resolution slower and more difficult.
Logistics would also become a significant burden. The customer would need to coordinate transport between suppliers, manage scheduling dependencies, and absorb the risk of delays or damage in transit. Any rework or deviation identified at a later stage would likely require back-and-forth movement of the component, compounding time and cost.
Additionally, tolerance control across multiple vendors becomes inherently more challenging. Without a unified process strategy, cumulative variation can occur, particularly in complex components requiring both fabrication and precision machining. This can lead to increased inspection requirements, potential non-conformance, and extended lead times.
By contrast, delivering this project within the DEG structure ensured continuity of ownership, controlled process flow, and a single point of accountability. This significantly reduced risk, simplified communication, and ultimately provided the customer with a more efficient, predictable, and reliable outcome.
Collaborative Manufacturing Across Two Specialist Facilities
This project demonstrates the strength of a coordinated manufacturing approach between Progress Engineering Limited (PEL) and James Camden Engineering (JCE), combining complementary capabilities to deliver a high-quality, precision-engineered component.
The component required a combination of machining, precision finishing, and controlled handling across multiple stages of production. To achieve this efficiently, the work was strategically split between both facilities, ensuring each stage was carried out in the most suitable environment.
Production Stages
Stage 1 – Pre-Machining of Hub (PEL)
Initial machining of the hub was carried out at PEL to establish critical datums and prepare the component for downstream processes. This ensured that sufficient material was left on the faces and bores for final machining, and post welding fabrication.
Stage 2 – Laser Cut Profile Preparation (PEL)
Precision laser-cut profiles were produced and prepared at PEL, forming the basis of the fabricated structure. This allowed tight control of geometry prior to assembly.
Stage 3 – Fabrication & Assembly (PEL)
All fabricated elements were assembled and welded at PEL under controlled conditions, ensuring structural integrity and alignment ahead of finishing operations.
Stage 4 – Weld Dressing & Polishing (PEL)
Welds were dressed and polished to achieve the required surface finish and remove excess material, preparing the component for final machining. Care was taken to ensure a hygienic, crack and crevice free finish.
Stage 5 – Post-Weld Machining of Hub (PEL)
Following fabrication, the hub was re-machined at PEL to correct any distortion introduced during welding. This step restored critical tolerances and ensured concentricity and alignment.
Stage 6 – Wire Erosion of Double Keyway (JCE)
The component was transferred to JCE for high-precision wire EDM of the double keyway. This process enabled extremely tight tolerances and accuracy that conventional machining could not reliably achieve.
Stage 7 – Dynamic Balancing
The completed part was then sent to a partner company for dynamic balancing to the customers specification.
Stage 8 – Final Finishing, QC Inspection & Dispatch (PEL / JCE)
Final inspection and finishing operations were completed, ensuring the component met all dimensional and quality requirements before being securely packaged and dispatched to the customer.
This project highlights the value of a fully integrated manufacturing approach, where the combined strengths of Progress Engineering Limited and James Camden Engineering are leveraged to deliver results that neither facility could achieve as efficiently in isolation.
By aligning capability, process control, and precision at each stage, we not only met the technical demands of the component, but delivered a consistent, high-quality outcome with complete confidence in performance and repeatability.
Customer bennifits with DEG Integration
Operating under the Drive Engineering Group (DEG) structure provides a level of coordination and control that extends beyond a traditional multi-supplier arrangement. Rather than managing separate subcontractors, the customer benefits from a unified manufacturing ecosystem where communication, scheduling, and quality standards are aligned from the outset.
Each facility within DEG operates with full visibility of the overall project requirements, enabling proactive planning between stages rather than reactive handovers. This reduces lead time risk, eliminates ambiguity in responsibility, and ensures that every process is executed with a clear understanding of downstream implications.
The integration between PEL and JCE allows for seamless transition between manufacturing stages, with shared quality expectations and consistent engineering standards. This avoids the typical friction points seen when components move between unrelated suppliers, where interpretation, tolerance stack-up, and accountability can often become diluted.
From a commercial perspective, this structure simplifies procurement. The customer engages with a single, accountable group while still accessing a broad range of specialist capabilities. This delivers the flexibility of a multi-supplier solution without the administrative burden or associated risk.
Customer Impact Without DEG Integration
Without the coordinated approach provided by DEG, the customer would have been required to source, manage, and align multiple independent suppliers across machining, fabrication, wire EDM, and finishing processes.
This introduces several layers of complexity. Each supplier would operate with their own interpretation of drawings, tolerances, and process priorities, increasing the risk of misalignment between stages. Responsibility for dimensional accuracy and quality would become fragmented, making issue resolution slower and more difficult.
Logistics would also become a significant burden. The customer would need to coordinate transport between suppliers, manage scheduling dependencies, and absorb the risk of delays or damage in transit. Any rework or deviation identified at a later stage would likely require back-and-forth movement of the component, compounding time and cost.
Additionally, tolerance control across multiple vendors becomes inherently more challenging. Without a unified process strategy, cumulative variation can occur, particularly in complex components requiring both fabrication and precision machining. This can lead to increased inspection requirements, potential non-conformance, and extended lead times.
By contrast, delivering this project within the DEG structure ensured continuity of ownership, controlled process flow, and a single point of accountability. This significantly reduced risk, simplified communication, and ultimately provided the customer with a more efficient, predictable, and reliable outcome.
Contact us ...
Unit G, 36 Normandy Way,
Walker Lines Industrial Estate,
Bodmin,
Cornwall,
PL31 1EX
© Copyright - Progress Engineering Limited 2025
Progress Engineering Limited,
Unit G, 36 Normandy Way,
Walker Lines Industrial Estate,
Bodmin,
Cornwall,
PL31 1EX
© Copyright - Progress Engineering Limited 2025