General

Lifting, carrying and office support

We are equipped not only with an impressive range of engineering machinery but with modern office facilities that meet ISO 9001 standard, including an up-to-date IT system using AutoCAD.

With a ceiling height of 6m, our covered workshop space can certainly cope with fabrications up to 4m high or perhaps a little higher. Floor space is very extensive.

As well as a 5 tonne overhead crane we have a rail-mounted bogie which can support up to 40 tonnes. This can be used to move fabrications within the workshop and then out, again via rails, to the loading area. The heaviest products are lifted onto a lorry using a locally hired mobile crane.

Our premises are easily accessible to transporters sent by clients, or to carriers arranged by PEL, and the lorries are back on Cornwall’s main highway within five minutes of leaving us. Products are regularly dispatched to Scandinavia and to various part of the UK.